Press Release

Filter Options

Period

APG-Neuros Expansion Continues Into the UK Blainville, QC (June 03 2015)

APG-Neuros, the market leader of high efficiency turbo blowers, has completed the commissioning of its product at the Thames Water and is in the process of completing three projects with other UK Waste Water Utility companies. 

more
APG-Neuros Ranks No. 66 on the 2013 PROFIT 500 Blainville, Québec (June 03 2013)

PROFIT magazine unveils the 25th annual list of Canada’s Fastest-Growing Companies.

more
500th Blower Delivered in North America Blainville, Québec (September 24 2012)
more

The Artemis Project Top 50 Unveils 2011’s Most Innovative Water Technologies

Blainville, Québec (May 17th, 2011) – APG-Neuros, Inc., leading manufacturer of high efficiency Turbo Blowers, is pleased to announce that it has been chosen by the Artemis Project TM as the winner of the Top 50 Water Companies Competition and APEX Sustainability Prize. The Artemis Project, industry practice involving representatives from the EPA and the industry, identified the 2011 Top 50 most promising companies that are applying innovation in the market to address today’s dire water challenges. The companies identified were revealed at the Ontario H20 Global Water Leadership Summit held on May 17th at the Toronto Convention Center in Toronto, Canada.
more
APG-Neuros, division of APGN, leader in the turbo blower  industry, is pleased to announce that its product line, including NX100-C, NX150-C, NX200-C, NX300-C, NX350-C, NX400-C blower models is UL Listed as of March 15th, 2011 in the category of Compressors, Vacuum Pumps and Pneumatic Paint Sprayers – certificates QDGS.E338595 and QDGS7.E338595.
more
APG-Neuros, manufacturers of High Efficiency Turbo Blowers, is proud to announce the completion of the certification of the high efficiency of the NX 300 (300 horse power)
more
APG-Neuros, manufacturers of High Efficiency Turbo Blowers, officially signed documents on September 10th to acquire two grounds at an industrial park in Blainville, Québec. Two new state of the art facilities will be built on those grounds, which will house its headquarters and a production plant that will help support the North American demand for its product. These grounds occupy an area of 16,627 m² and 8,650 m². A building of 2,787 m² is scheduled to be completed by the end of 2010 on the larger of the two grounds, while another building which will occupy the second ground will be built within the next four years; no specific date was yet set.
more
In June 2010, members of the South Valley Jordan Basin, UT, Project witnessed successful testing of 13 NX300 Blowers at Neuros’ facility in South Korea. Representatives from the South Valley Project and the Chief Engineer from Bowen, Collins & Associates reported that the test results satisfied the project specification requirements.
more